House Renovation in Glifada

Apartment renovation in Glyfada

The house has been renovated and completely renovated in all areas, with the result that it justifies the options, since we are now talking about a new modern and modern apartment.

The new kitchen was installed in a new space, after the complete dismantling of the old plumbing and electrical installation.
We made the new kitchen door Lpl. There were also two new opening wardrobes in the bedroom with lpl door.

The entire old electrical installation was completely dismantled and a new home electrical network was built from scratch. New electrical pipes, new patient and high current, bi-zonal alarms, new HAGER board with HAGER fuses, also HAGER digital voltage monitor, new grounding and a complete new electrical installation.

Following the dismantling of the old flooring throughout the house and the balconies, new gress porcelanato tiles were installed throughout the house as well as in the bedrooms.

The old bathroom, all the old plumbing and electrical installations, pipes and drains were completely dismantled and refurbished, and a new modern bathroom, and a WC with a new hydraulic-drainage and electrical installation and a separate water table were built from scratch.
New sanitary ware, batteries and a cabin with a safety glass were installed.

The interior doors were refurbished and a new double shield, 16-point locking door and double catapult lock were installed.

All the old exterior frames of the apartment were replaced and new europa brand aluminum sliding power windows and sliding shutters were installed.

Before installing the new floors, we had a completely new underfloor single-tube heating system and the bodies were now placed in the new correct loss points. New panel bodies of the delonghi panel were also installed

We trimmed, weeded and plastered all the walls of the house, primed at least two hands with a special primer to avoid any future shading and then painted all areas with ecological and washable colors. The exterior walls of the house were all painted in acrylic paint.

Completing, after wishing our customers and friends first, ‘summer’ with a new modern apartment and a thorough and complete home renovation by G + G GROUP.
I would like to personally thank them for our excellent cooperation throughout the renovation, from start to finish.

Completion time 65 days.